Lester Controls was approached by Titan New Lifts to help with a lift controller solution for the Battersea regeneration project redevelopment, currently in phase 4a, that will provide 386 homes over seven apartment blocks, ranging from 9 to 18-storeys.

The chosen controller solution was our ALMEGA II MRL controllers (fourteen in total), along with a range of Lester Controls ancillaries for each lift.

For the full details, go to page 12 of NewsLester Issue 3: https://bit.ly/3Mp6Njp