55 Baker Street, London
Lester Controls partnered with Elite Elevators to deliver a major lift modernisation project at 55 Baker Street, London. The project involved replacing lift controllers originally manufactured by Lester Controls in 2007, demonstrating the longevity of our systems and the continued trust of our customers.
The project required the modernisation of a busy commercial building while maintaining operational efficiency and meeting the latest safety standards. The solution needed to:
Upgrade an existing multi-lift installation
Achieve full EN81-20 compliance
Incorporate modern monitoring and positioning technologies
Minimise disruption within an occupied building
Future-proof the installation for long-term performance
Lester Controls supplied a comprehensive control package, working alongside Elite Elevators to upgrade the existing installation with the latest control and monitoring technology.
Address: 55 Baker Street, London, W1U 8EW
Completed: May 2024
2 × 9-stop, 6-car lift groups
1 × firefighting lift compliant with EN81-72
1 × goods lift
Replacement of Lester Controls systems originally supplied in 2007
Full EN81-20 compliance
LCSL GMS remote monitoring
Cedes APS positioning system
Modernised control equipment across the installation
Enhanced operational efficiency
Future-ready performance and diagnostics
The completed project delivered a modern, compliant and efficient lift control solution for one of London's landmark commercial buildings. By replacing Lester Controls equipment originally installed in 2007, the project also highlights the durability of our systems and the long-term partnerships we continue to build with our customers.